top of page
CSS Chicora

CSS Chicora

Namesake: Chicora

Ordered: 1862

Laid Down: March 1862

Commissioned: November 1862

Fate: 18 February 1865

​

Characteristics

​

Displacement: 580 tons

Length: 172 ft. 6 in.

Beam: 35 ft.

Draft: 14 ft.

Propulsion: Steam engine

​

​

Armament

​

2 x 9-in smoothbores

4 x 6-in 32-pounder muzzle loading rifles

​

​

Battles

​

Raided the Federal blockading force of unarmored ships lying just outisde the entrance to Charleston Harbor.

Engaged other Union ships in a long-range duel

April 7, 1863: Defense of forts at Charleston when attacked by squadron of ironclad monitors. The Federal ships were forced to retire for repairs and did not return to action.

1864: Transporting of troops during the evacuation of Morris Island, and the bombardment of Forts Sumter, Gregg, and Wagner.

​

​

CSS Chicaro. https://en.wikipedia.org/wiki/CSS_Chicora. Accessed 13 January 2026

Luraghi, Raimondo. A History of the Confederate Navy. Annapolis, MD: Naval Institute Press, 1996. p 209-210, 337

Stern, Philip Van Doren.  The Confederate Navy A Pictorial History. New York: Da Capo Press, 1992. p 130-131, 143-144, 243

​

bottom of page